Watershed Summary Report for Scenario [ptree] Run Made 2002-07-03 12:53 Average Annual Rates and Totals UCI Created by WinHSPF for ptree Initial Water Quality Calibration Time Span: 7 yr from 10/01/92 to 10/01/99 NH3-POQUAL/NH3-SOQUAL/NH3L/TAM-OUTTOT Land Use Perv. Imperv. Eff.Imp. Combined Area Total % GrTot. lbs/acre lbs/acre lbs/acre acres lbs POQUAL SOQUAL ATLANTA,PI:PREC=1.0643 Commercial 0.826 1.061 64% 0.977 12,091 11,809 14.4% Industrial/Instituti 0.844 1.061 33% 0.916 2,797 2,562 3.1% Transportation and U 0.844 1.061 64% 0.983 2,266 2,228 2.7% Extractive & Transit 0.799 1.061 20% 0.851 338 288 0.4% Low Density Resident 0.642 0.778 4% 0.648 1,229 796 1.0% Medium Density Resid 0.835 0.801 8% 0.832 25,120 20,912 25.5% High Density Residen 0.835 0.872 22% 0.843 7,739 6,526 8.0% Agricultural Lands 0.606 0.000 0% 0.606 37 22 0.0% Forest/Open Space 0.125 0.000 0% 0.125 3,178 397 0.5% Water/Wetland 0.131 0.000 0% 0.131 380 50 0.1% Seg Wtd Aver/Tot 0.768 1.000 25% 0.826 55,175 45,589 55.5% Totals for all Non-Point Source Segments Commercial 0.826 1.061 64% 0.977 12,091 11,809 14.4% Industrial/Instituti 0.844 1.061 33% 0.916 2,797 2,562 3.1% Transportation and U 0.844 1.061 64% 0.983 2,266 2,228 2.7% Extractive & Transit 0.799 1.061 20% 0.851 338 288 0.4% Low Density Resident 0.642 0.778 4% 0.648 1,229 796 1.0% Medium Density Resid 0.835 0.801 8% 0.832 25,120 20,912 25.5% High Density Residen 0.835 0.872 22% 0.843 7,739 6,526 8.0% Agricultural Lands 0.606 0% 0.606 37 22 0.0% Forest/Open Space 0.125 0% 0.125 3,178 397 0.5% Water/Wetland 0.131 0% 0.131 380 50 0.1% Non-Pnt Wtd Aver/Tot 0.768 1.000 25% 0.826 55,175 45,589 55.5% Point Sources NH3L Clear_Creek_CSO 18,995 23.1% Tanyard_Creek_CSO 17,503 21.3% Septic Failure 0 0.0% Point Wtd Aver/Tot 36,498 44.5% Reaches TAM-OUTTOT N Fork Peachtree Ck 19,623 23.9% Up So Fork Peachtree 14,105 17.2% Peachtree Ck 78,868 96.1% Grand Total 82,088